Dubai has inaugurated the GCC's first pumped-storage hydroelectric power plant in Hatta, an AED 1.4 billion facility developed by the Dubai Electricity and Water Authority (DEWA).
Sheikh Mohammed bin Rashid Al Maktoum, Vice President, Prime Minister and Ruler of Dubai, opened the plant on 26 November during a tour of the mountain town. The facility has 250MW of generation capacity, 1,500MWh of storage and an 80-year operational life. It works like a giant battery. Solar power from the Mohammed bin Rashid Al Maktoum Solar Park pumps water up to a dam in the mountains, and the water is later released through a 1.2-kilometre tunnel to drive turbines, with a round-trip efficiency of 78.9%.
The project supports the Dubai Clean Energy Strategy 2050 and the UAE Net Zero 2050 Strategy. On the same visit, Sheikh Mohammed reviewed the Hatta Master Development Plan, which targets an economic impact of around AED 1.2 billion by 2040.
Gulf Economist Staff Writer
